The start of it all with the concrete being poured.The grain bins (2) that came from the SW part of ND.
Ty and his crew took them down and brought them home.
The start!! After the first ring the roof goes on.
They said the roof was the hardest part. Jerry, Jim and Doug.
Ty way up on top doing the hardest work!! :-)
Much labor involved. Doug, Jim and Ty.
The start!! After the first ring the roof goes on.
They said the roof was the hardest part. Jerry, Jim and Doug.
Ty way up on top doing the hardest work!! :-)
Much labor involved. Doug, Jim and Ty.
Seven rings up and you can see the end in sight.
the hydraulic jacks that lift the bin so another ring
can be added.
outside this day.
it all out to make sure all is ready. Jerry and Justin in the
tractors to raise it with the hydraulic jacks.
1 comment:
Wow, that is quite the process! How great will it be to have that nice staircase on there. Nicely done boys...
Post a Comment